The people: We could tell that these are experienced professionals. And every worker was polite and friendly. The sale: Two people asked what we needed, looked at the situation, then sat with us and worked through the plan. The construction: Since the shower (master bathroom) and tub (guest bathroom) were back-to-back and that wall was rotting, the old set-in stall and old iron tub had to be removed for wall repair and shower and tub replaced. The old stall was actually a stall in a stall, making it very small. The new shower is acrylic surface on the walls, making it 4" larger than before. We had them add a folding seat so washing toes is easier. Over all, we are five stars happy with the installers and the result.
Let’s Get You A Free Quote